Back
 
Overview of the 1993 excavations at the Rush site.  Here archeologists from a consulting firm, Mariah Associates, Inc., work in the main excavation block.  The investigations were done just in advance of the construction of a large water supply pipeline—the waiting concrete pipe sections can be seen on the right.  TARL archives.
Back