Rearranged portion of a field drawing of the profile of one of the trenches hand-excavated through the Millington site in 1938-1939 by WPA workers. Lehmer and Kelley used these trenches to explore the site and document additional structures beyond those chosen for excavation. TARL Archives. Enlarge to see more detail.
Close Window